Categories
Construction General Rapidways Uncategorized Urban Planning

See the Keith Bridge transformation

If any of you have been out and about along Davis Drive, around the Tannery then you probably noticed construction taking place on the north side of the Keith Bridge.  The old bridge was completely demolished to make way for a new one.  Construction has been done in two phases – the south side first and the north side second.

The demolition of the north side was caught on tape. It has been made into a short time lapse video so that you can watch the whole thing. As you will see in the video, bridge demolition takes careful planning and organization.  Take a look. We may be biased but we think it’s a tad mesmerizing as the cranes do their “dance”.

When complete in 2014, the Keith Bridge will be an architecturally designed, historically-motivated focal point along Davis Drive. It will reflect Newmarket’s rich heritage and growing community, making it an even better place to live, work, shop and play.

Click here to check out the time lapse video.

Leave a Reply