Nighttime lane closures on Davis Drive

What type of work is being done?

Approximately 45 test holes will be dug along the north and south sides of Davis Drive, from Yonge Street to Roxborough Road. The work will start on August 31 and will take place over two nights, from 7pm to 7am.

Why is this being done?

The test holes will help determine the location of underground utilities and pipes in preparation for the next phase of rapidway construction.

What does the work include?

  • Test holes will be dug in the side boulevard and road.
  • Each test hole will take approximately 30 minutes to dig.
  • Two hydrovacs (truck-mounted vaccums) will work in tandem along the corridor to complete the work quickly.
  • Work after 10pm will be in commercial areas.
  • Each hole will be filled and paved before the hydrovac moves to the next location.

What impact will there be?

  • Nightly lane closures along Davis Drive, starting with closing one eastbound lane and then moving to close one westbound lane.
  • Continuous noise and vibration from the hydrovac.
  • If sidewalks need to be detoured signs will be in place to direct pedestrians.
  • Bus stops will remain open.
  • Work will be completed as quickly as possible to minimize any inconvenience.

If you have questions about the Davis Drive rapidway project, please contact Andrea Witty, Community Liaison Specialist at andrea.witty@york.ca or 1-877-464-9675, ext. 1022.

Construction crew working with a hydrovac 

follow the progress of the davis drive transformation

contruction banner

Rapidway map

 

Construnction
Complete
54%
as of 2nd quarter


mini photos

more than just a rapidway
rebuilding Davis from the ground up
Davis Drive is approaching its final year of construction and we thank you for bearing with us as we work hard to transform Davis Drive.

construction is challenging
Completely rebuilding Davis is a challenging and complex project that required replacing and relocating outdated utilities and infrastructure under and above ground, before road widening could begin.

what’s to come
Substantial work above ground is underway. Here’s a snapshot of how work is progressing.

 

  • Construction of the vivastation at Parkside/Longford and Davis is underway.
    The steel structure and glass canopy shelter will arrive later this fall.
  • Construction of two more vivastations at Main and Southlake Hospital
    will also begin later this year.
  • The reconstruction of the Keith Bridge will be completed this fall.

viva is coming to davis – dec. 2015
In addition to having a centre-lane bus rapidway, Davis will have wider sidewalks, green open spaces and dedicated left-turn lanes at each intersection that will improve overall traffic flow. All these changes will make Davis an even greater destination to live, work, shop and play.

Go behind the scenes to see how vivaNext is transforming Davis

....