sidewalk work on South Town Centre Blvd.

May 11, 2015

Please see the information below about a temporary sidewalk closure on the west side of South Town Centre Boulevard, south of Highway 7 East.

Location: The west sidewalk on South Town Centre, between Highway 7 and Clegg Road, will be completely closed.
Dates: Monday, May 11 to Friday, May 15
Times: This sidewalk closure will be in place 24 hours per day and the work will be completed weekdays from 7am to 5:30pm.

Description:

  • The sidewalk on the west side of South Town Centre will be closed from Highway 7 to Clegg to install planters and pour concrete.
  • Pedestrian access will be maintained on the east side South Town Centre.
  • The driveway to 60 South Town Centre will remain open and vehicle access will be maintained throughout the work. Pedestrians will be able to access 60 South Town Centre by walking on the east sidewalk of South Town Centre and crossing at Clegg.
  • Work will be completed as quickly as possible to minimize any inconvenience.
  • There will be construction-related noise from equipment and trucks.
  • This work is weather-dependent.

Please remember to reduce your speed through construction zones and be mindful of traffic shifts and signs that will help guide you along your way. If you’re walking, please use dedicated crosswalks and stay aware of your surroundings.

If you have questions about the rapidway project, please visit vivanext.com, or contact your community liaison team.

Linda Filippi
Manager, Community Liaisons
Tel: 905.886.6767 Ext. 71057
Cell: 905.505.0541
Email: linda.filippi@york.ca