Archive for the ‘Announcements’ Category

be ready… 30 days to subway

Friday, November 17th, 2017

The countdown is on, and we can hardly wait! The first subway in York Region will arrive in just 30 days. The TTC Line 1 subway extension is a game-changer for transit in Vaughan Metropolitan Centre [VMC], York Region, and beyond.

Changes of this magnitude are fueled by the power of collaboration and funding partnerships. Today, vivaNext participated in a media event to kick off the countdown in earnest, along with the Government of Canada, the Province of Ontario, the City of Toronto and the TTC.

Read the news release

mega-connections at VMC

The TTC Line 1 extension isn’t the only connection coming your way. Everything’s changing, and that makes for better, faster transit service.

  • The Highway 7 West rapidway between Edgeley Boulevard and Jane Street, including Vaughan Metropolitan Centre Station in the centre of Highway 7, will open for service.
  • SmartCentres Place Bus Terminal will begin hosting YRT/Viva soon after.

Imagine, hopping on Line 1 at VMC Station and arriving downtown in just 45 minutes. Or from the subway, connecting directly to our Highway 7 West rapidway, or walking two minutes to the SmartCentres Place Bus Terminal, where YRT/Viva routes branch out across York Region. Soon you won’t have to imagine!

Today’s event was a warm-up for the big celebration on December 17, and you’re invited to share the celebration. Check vivanext.com/VMCopening for links to detailed information.

award-winning design

In other news, our rapidway in Vaughan is already getting noticed, for the quality of the design and also for the collaboration behind the scenes that makes it all come together.

Earlier this week, we were honoured to receive an Award of Merit from the Vaughan Urban Design Awards for the first phase of our Highway 7 West rapidway. The awards celebrate excellence in architecture, urban design, landscape architecture and environmental stewardship.

The rapidway, running from Jane Street to Bowes Road, was unanimously praised by the jury as “A great example of collaboration and investment between multiple levels of government to demonstrate significance on a city-wide scale.”

The jury also called the rapidway “a catalyst to knit communities together”, noting that the project “presents public transit as a ‘cool and hip’ mode of transportation” and “makes the everyday experience of transit a beautiful one.”

We hope you agree. Riding transit can be a beautiful experience.

VivaNext made the Top 100 Urban Planning blog list!

Thursday, October 19th, 2017

The vivaNext blog has been called out by Feedspot as one of the Top 100 Urban Planning Blogs. We came in at #55 on this list, which includes notable think tanks and urban planning publications, such as CityLab, Planetizen, The Urbanist and Spacing.

We’re humbled, honoured – and very excited – to be in the company of such notables, and to be included in one of Feedspot’s ‘best of’ lists.

Our place on this list shows the vital connection between urban planning and transportation planning, and the importance of urban design when building transit systems. Our blog reflects that, ranging from updates on our rapid transit projects to the big picture of what it all means from a smart growth perspective.

The fact is, we’re not just building transit. We’re building connections that make communities work for the future, and attractive destinations for people living, working, and travelling in York Region. We’re always looking for new topics to write about – urban planning or otherwise – so if you have a suggestion for a blog topic, be sure to let us know!

Yonge Subway Extension moving forward

Wednesday, July 5th, 2017

Yonge Subway Extension moving forward

Recently, the Government of Canada announced more than $36 million in federal funding to support the planning and preliminary engineering of the proposed 7.4 km extension of the existing Yonge Subway line into York Region.

This is a positive announcement for York Region and for the entire GTA, because it allows this critical project to move one step closer.
number one transit priority

Yonge Subway Extension continues to be the top transit priority of York Regional Council, the Region’s nine municipal governments and many of the Region’s business organizations. It’s part of the Metrolinx Next Wave projects and the Government of Ontario committed $55 million to the project last year for design work.
2,500 reasons to move forward

Today, this segment of Yonge Street requires 2,500 bus trips a day to accommodate the current ridership. If the subway is extended, really all of these buses would no longer be needed, significantly reducing traffic congestion and eliminating over 28 tonnes of greenhouse gas emissions per workday.
good for business

The Region is Canada’s fastest-growing large municipality, home to Canada’s high tech capital and two of the GTA’s four Employment Megazones – Highway 404/Highway 407, and Highway 400/Highway 7.

One of Ontario’s largest business communities, the Region has over 50,000 businesses and almost 600,000 jobs, with an average of 13,000 new jobs every year. Over the last five years, York Region’s workforce has grown at an average annual rate of 3.1%, surpassing growth rates in the nation, province and GTA.
The Yonge Subway Extension will move two riders every second of the day, on average making it easier for everyone to get where they need to go. It’s exciting to see this project – the GTA’s missing link – moving forward!

a connected transit terminal

Wednesday, January 11th, 2017

a connected transit terminal

This morning, we marked the beginning of construction for a new YRT bus terminal in Vaughan Metropolitan Centre [VMC]. The news release gives the basic project information, but doesn’t delve into how this terminal will connect in the GTA transit network:

bus

Well, it is a bus terminal. YRT buses will use this terminal, taking customers in and out of York Region’s neighbourhoods and to places farther away like Brampton and northern Toronto. Customers will also be able to walk to the VMC vivastation in the middle of Highway 7, where Viva will take them away on dedicated bus rapid transit lanes. They’ll walk about two minutes above ground, or when the weather is frightful they’ll take the underground path and escalator, elevator and stairs to reach the vivastation.

subway

Customers will take the underground path or walk along landscaped paths outside to the VMC Subway Station entrance just south of the terminal, to access the underground concourse for the Toronto-York Spadina Subway Extension. The subway concourse is actually under the vivastation on Highway 7 – stay tuned for a future blog about this.

walking and cycling

The VMC area is planned as a walkable area with tree-lined sidewalks and places to live, work, shop and take transit. The terminal will meet accessibility standards, and customers will be able to walk or cycle there from any direction.

driving

The terminal is near the intersection of Highway 400 ad Highway 407, so a passenger pick-up and drop off [aka. “kiss ‘n ride”] will be included, encouraging carpooling.

 

So it’s not your typical bus terminal and it’s more than a place to wait for the bus. It’s about connections, and where they’ll take you from here.

 

celebrating the completion of the Davis Drive rapidway

Wednesday, October 12th, 2016

YouTube video: timelapse of Davis Drive

Last week, the Honourable Steven Del Duca, Minister of Transportation; Wayne Emmerson, Chairman and CEO, The Regional Municipality of York; Bruce McCuaig, President and CEO, Metrolinx; the Chairman of the YRRTC Board, Frank Scarpitti, Mayor of the City of Markham and Tony Van Bynen, Mayor of the Town of Newmarket, joined together to celebrate the transformation of Newmarket, with the completion of the bus rapid transit (BRT) rapidway project on Davis Drive.

The Davis Drive rapidway was opened for the new Viva service in November 2015, extending 2.7 kilometres from Yonge Street to Roxborough Road, with service continuing in mixed traffic another 2.3 kilometres with curbside stops and a turn-around at the new park and ride facility at Highway 404. This past spring, crews began work on the finishing touches such as planting trees and installing the last sections of sidewalk.

Rapid transit along Davis Drive promotes growth and development, and supports the priorities of the Town of Newmarket’s Strategic Plan, York Region’s Centres and Corridors plan, Metrolinx’s Regional Transportation Plan for the Greater Toronto and Hamilton Area (GTHA) and Ontario’s Growth Plan for the Greater Golden Horseshoe.

Along with providing a convenient new travel option, the Davis Drive rapidway project helped transform Newmarket with updated utilities, new infrastructure such as a water main and the Keith Bridge, and wider boulevards. These improvements will help support the continued growth and development in Newmarket’s town centre.

The Davis Drive rapidway has been years in the making. We’ve captured the entire transformation on video. Through all the planning, design and construction there’s something special about knowing that you’ve contributed to the future growth and prosperity of entire neighbourhoods, towns and regions by connecting people to the places they work, shop and play.

We would like to sincerely thank the community, businesses and residents that have supported the project from the outset, and endured the disruptions that come with long term construction. Your patience, understanding and feedback have been invaluable. Newmarket now has a rapid transit system we can all be proud of and enjoy for many years to come.

 

bragging rights

Friday, October 16th, 2015

bragging rights

Well. We hate to brag, but we think those in the Highway 7 area would like to know – Roads and Bridges magazine has included the Highway 7 East rapidway project as #2 in their “Top 10 Roads” list for 2015.

The Highway 7 East project was recognized as a multi-modal “complete street” throughway, with the trade magazine noting the transit operations technology, the red-pigmented pavement, bike lanes and sidewalk landscaping.

Our office is located along the Highway 7 East rapidway, so we have to agree that the rapidway project has transformed Highway 7. West of Warden, the street has changed from being a highway with gravel shoulders, to being an attractive and safe place to walk, cycle, drive or ride Viva. The project included updated utilities, and has helped set the stage for the new developments along this important road.

Roads and Bridges voted the Highway 7 East rapidway project the second-best project in North America, and although it will always be number one in our books, we’re pleased to see it recognized by others in the industry.

 

rolling out a new phase of rapid transit in Vaughan

Wednesday, September 30th, 2015

rolling out a new phase of rapid transit in Vaughan

The next phase of Viva is extending both east and west in Vaughan and Richmond Hill. We were excited to announce this week that EDCO has been awarded the $333.2 million contract to design, build and finance the second phase of the Highway 7 West rapidway.

The first phase of rapidway is well underway in the Vaughan Metropolitan Centre [VMC], with the vivaNext rapidway between Jane Street and Bowes Road scheduled to open in Fall 2016, and the section west of Jane being coordinated with the opening of the Toronto-York Spadina Subway Extension [TYSSE].

phase two

Phase two of the Highway 7 West rapidway will emerge from both sides of the current construction. It will extend west from the VMC, over Highway 400 all the way out to Helen Street, and it will expand east to Yonge Street along the existing Centre Street and Bathurst Street Viva route.

making connections

Extending the rapidway will connect riders from Woodbridge, Concord and Thornhill to the Spadina/University Subway line at the new VMC subway station, and will also connect riders to the rest of York Region via the Richmond Hill Terminal at Yonge Street.

The project involves widening Highway 7, Bathurst Street and Centre Street to add 12 kilometres of dedicated rapidway lanes for Viva rapid transit vehicles PLUS 10 new vivastations, PLUS new bike lanes PLUS pedestrian walkways and sidewalks.

partnering with contractors

As with our previous rapidway projects, this is a public-private partnership. One key difference is that along with the design and build requirements, the contractor is required to finance this project. YRRTC will be the project manager, controlling and approving the design and construction, financial management, and community relations. Metrolinx will own the assets of the rapidway infrastructure, and YRT/Viva will operate transit on the rapidways, and maintain the stations. On regional roads like Highway 7, Centre Street and Bathurst Street, York Region will maintain the road and rapidway.

more than a third of York Region’s rapidways

This project represents more than a third of the total 34 kilometres of rapidways being built, and with this contract awarded, all of our rapidway projects are on the way, except Highway 7 East, which is done!

To learn more about the Highway 7 West, phase two rapidway project, and to sign up for updates, visit vivanext.com/subscribe.

 

introducing our new board members

Friday, January 30th, 2015

introducing our new board members

For those of you who have been riding along with us on this transit journey, we are excited to update you on our award-winning rapid transit initiatives as we begin 2015 and new stages of construction. This is an exceptionally exciting time for transit in Ontario, and in York Region. Over the next five years, we will be completing $3.2 billion of infrastructure, including rapidways in Newmarket, Vaughan and Richmond Hill, a state-of-the-art Operations, Maintenance and Storage Facility and more. We remain dedicated to building transit options that complement the future of York Region, knowing that everyone shares the benefits of these successes.

How do we do it? Here’s a bit of information about the governance structure and make-up of York Region Rapid Transit Corporation [YRRTC] and how we operate to deliver vivaNext plans. First, YRRTC is a 100% share capital corporation owned by York Region. Our rapidway projects are funded by Metrolinx [an agency of the provincial government], and our facilities and terminals are funded from a combination of federal, provincial and regional government sources. Our governance structure is well established through formal documents and legal agreements between YRRTC, York Region, the provincial government, the federal government and Metrolinx. These legal documents set the framework for how we work together and list the conditions of our funding.

YRRTC reports monthly to a board of directors – seven Mayors and Regional Councillors from Markham, Richmond Hill, Newmarket and Vaughan. Once appointed, they elected a Board Chairman, Vice-Chairman, and CEO. We welcome the new and returning board members:

Chairman - Frank Scarpitti, Mayor of the City of Markham Chairman
Frank Scarpitti
Mayor of the City of Markham
Vice-Chairman - Maurizio Bevilacqua, Mayor of the City of Vaughan Vice-Chairman
Maurizio Bevilacqua
Mayor of the City of Vaughan
Director and YRRTC CEO - Wayne Emmerson, Chairman and CEO of The Regional Municipality of York Director and YRRTC CEO
Wayne Emmerson
Chairman and CEO of The Regional Municipality of York
Director - Dave Barrow, Mayor of the Town of Richmond Hill Director
Dave Barrow
Mayor of the Town of Richmond Hill
Director - Tony Van Bynen, Mayor of the Town of Newmarket Director
Tony Van Bynen
Mayor of the Town of Newmarket
Director - Jim Jones, City of Markham Regional Councillor Director
Jim Jones
Regional Councillor, City of Markham
Director - Vito Spatafora, City of Vaughan Regional Councillor/Deputy Mayor Director
Vito Spatafora
Regional Councillor/Deputy Mayor, Town of Richmond Hill

 

Through monthly reports and other regular reporting tools such as business plans and annual reports, we seek direction from the board and keep them informed of project progress. These documents can be found in our website Document Library.

It’s complex, with multiple levels of government and representatives from different municipalities, but it’s a clean mission to collectively deliver rapid transit. And together we can continue to deliver these beneficial infrastructure projects to your community and ensure all needs and issues are addressed quickly and openly.

 

introducing the newest vivastation in Markham

Friday, January 9th, 2015

introducing the newest vivastation in Markham

Introducing the newest vivastation in Markham…[drum roll please]…Cedarland Station! On Cedarland Drive just south of Highway 7, this new vivastation boasts all the comforts and conveniences of our previous stations, in an exciting up-and-coming location. Cedarland Station is located on the doorstep of condo developments underway, and within walking distance of major employers such as IBM, CDI, Hilton Hotel and City of Markham. One unique feature of this new station is that it’s on the south side of the road, instead of down the centre. This allows for a transition to Warden, and to the existing rapidway on the north side of Enterprise Drive. When making the turn onto Cedarland, drivers should be cautious that they are turning into the correct lane, as it is unusual.

Some finishing touches will be added in the summer to the rapidway near Cedarland Station, including a final top-coat of pavement, the sidewalk on the north side of Cedarland and trees and shrubs in the new planter boxes. With this section of rapidway connecting to the existing rapidway on Enterprise Drive, Viva customers can now travel over 35% faster, all the way from Bayview Avenue in Richmond Hill to the Downtown Markham development area.

Now that rapid transit has arrived in Markham and Richmond Hill, it will help shape communities and manage growth for generations. The urban areas along Highway 7 East are now connected and everyone has attractive, walkable places and more travel choices for healthy community living.

 

take a tour of the new rapidway on highway 7

Monday, September 15th, 2014

video: Highway 7 East rapidway - Now Open - 2014

This morning, The Honourable Steven Del Duca, Ontario Minister of Transportation, announced the opening of the section of rapidway from Highway 404 to South Town Centre on Highway 7 East. He was joined by: The Honourable Michael Chan, MPP, Markham; Bill Fisch, Chairman and CEO, The Regional Municipality of York; Bruce McCuaig, President and CEO of Metrolinx; Frank Scarpitti, Mayor of the City of Markham.

Travelling along Highway 7, it’s hard to miss the beautiful and functional vivastations in the centre median. These stations are making a huge contribution to the transformation of our community in Richmond Hill and Markham, so let us take you on the same guided tour as our dignitaries took this morning for an inside look at the benefits and attributes of these stations.

The first thing you’ll notice as you cross to a station is how big and airy the canopy is at 28m [92’] long and 5m [16’] high. The curved glass above the platform provides both weather protection and a sense of space at the same time and satisfies long-term needs as platforms accommodate two Viva vehicles at once and in future will be able to accommodate Light Rail Transit [LRT]. The platform is approached by a gently sloped ramp with handrails on both sides, making it fully accessible to all, whether they’re walking, pushing a stroller, or in a wheelchair or scooter. Passing by the familiar Viva fin and planter boxes with greenery, you’ll next come to an illuminated wall map of the YRT\Viva system.

Next on the tour is a bank of fare equipment, including a Ticket Vending Machine [TVM], a Ticket Validator [TV], and two PRESTO machines. Once you’ve paid your fare, you’ll move to the Fare Paid Zone [FPZ], which is clearly shown by being paved with a different coloured tile on the ground, as well as by a curved sign above. This area needs to show as distinct, because YRT fare rules require passengers to have paid their fare before moving into the FPZ.

Once you’ve paid your fare, you’re free to make yourself comfortable on the platform until the next bus arrives. We’re making it easy for you to know how long you’ve got to wait, with a large Variable Message Sign [VMS] projected from the canopy. The VMS scrolls through the upcoming Viva arrivals, telling you exactly when the next bus will arrive. Because the VMS system is connected to the GPS technology in our Viva vehicles as well as to the central transit scheduling software, it’s constantly updated to provide accurate and real-time information.

If you decide to sit on a bench or get comfy out of the elements, the shelters have been designed with passenger comfort as a priority. The heated glass enclosure is well lit, and accessed by two push-button automatic doors. The heaters – which will be appreciated later this year – automatically turn on if someone enters the enclosure, and if the temperature in the enclosure feels lower than 10 degrees Celsius. Recycling and garbage disposal units on the platforms make it easy to keep these lovely stations clean.

The entire platform will be well lit, with lighting inside the canopy as well as on the platform.  And to enhance your feelings of comfort and security, the back of the platform is protected from Highway 7 traffic by a barrier wall topped with a guardrail, and there are multiple security features including cameras and an emergency call button.

Last but not least, to help you stay oriented, wayfinding signage will show you where the buses will stop, and other features including the way to the crosswalk.

It’s hard to do the stations, and the rapidway justice with written descriptions, so here’s a video showing you some of the action involved in completing this section of the rapidway. One of the regular passengers tweeted that “it has cut my travel time in half, way to go!”