Spadina subway extension
To download PDFs related to the completed Environmental Assessment for the Spadina subway extension, click on the links below. Additional information related to the subway extension is also available in the completed Environmental Assessment for the Highway 7 and Vaughan N-S link, and the Vaughan N-S Subway Alignment Optimization Report, which can be found here.
Addendum
- Notice of Preparation of an Addendum Report (5.4 mb)
- Double Ended Pocket Track EA Amendment (136 kb)
Executive Summary
- Executive Summary - Part I (5.4 mb)
- Executive Summary - Part II (7.2 mb)
- Executive Summary - Part III (1.2 mb)
- Executive Summary - Part IV (13.1 mb)
- Executive Summary - Part V (9.6 mb)
Environmental Assessment
- 1. Table of Contents (60 kb)
- 2. Introduction (536 kb)
- 3. Environmental Assessment Process (236 kb)
- 4. Consultation Program Summary (120 kb)
- 5. Existing and Future Conditions (5.4 mb)
- 6. Review of the Alternatives to the Undertaking (1 mb)
- 7. Alternative Methods of Carrying out the Undertaking (3.1 mb)
- 8a. Description of the Undertaking - Part I (10.6 mb)
- 8b. Description of the Undertaking - Part II (4.3 mb)
- 9. Effects of the Undertaking on the Environment (284 kb)
- 10. Commitments to Future Work (616 kb)
- 11. Abbreviations and Glossary (596 kb)
Appendices
- Appendices Volume 1 & 2 index (32 kb)
- A. Public Consultation Reports (11 mb)
- B. Key Correspondence with Public/ Property Owners (5.6 mb)
- C. Key Correspondence with Stakeholders/ External Agencies (4.4 mb)
- D. Geotechnical Investigation Report (12.6 mb)
- E. Natural Heritage Report (3.8 mb)
- F. Cultural Heritage Report (1.4 mb)
- G. Archaeological Assessment Report (1.6 mb)
- H. Air Quality Assessment Report (12.7 mb)
- I. Noise and Vibration Assessment Report (5.3 mb)
- J. Existing Land Use and Planning Report (3.8 mb)
- K. Detailed Evaluation of Alternative Routes and General Station Locations (788 kb)
- L. Detailed Evaluation of Alternative Alignments and Conceptual Stations (6.6 mb)
- M. Travel Demand Forecast Report (3.3 mb)
- N. Traffic Report for Finch West and Steeles West Stations (3.7 mb)
- O. Storm Water Management Report (8.8 mb)
- P. Construction Methods Report (1.5 mb)
- Q. Subway Operations Report (2.5 mb)




.jpg)


