Yonge subway extension
To address concerns raised late in the process, some minor revisions to the Environmental Project Report (EPR) were made after the Notice of Completion was published. Those revisions are outlined in the Summary of Changes. Following the revisions to the EPR, the Minister of the Environment issued an unconditional Notice to Proceed with Transit Project on April 6, 2009. In conclusion of this process, a Statement of Completion was filed with the Ministry of the Environment on May 4, 2009.
To download PDFs related to the Executive Summary and completed Environmental Project Report for the Yonge subway extension, click on the links below.
- Executive Summary (3.8 mb)
Environmental Project Report
- Preface (300 kb)
- 1. Introduction (3.8 mb)
- 2. Outline Study of Consultation Process (1.9 mb)
- 3. Study Area Conditions (2.6 mb)
- 4. Alternatives Considered and Features of the Recommended Transit Project
- Alternatives (3.4 mb)
- Description of the Recommended Transit Project (679 kb)
- Implementation (505 kb)
- 5. Detailed Assessment of the Impacts, Proposed Mitigation and Monitoring of the Transit Project (1 mb)
- 6. Commitments to Future Work (390 kb)
Appendices
- A. Preliminary Alignment Engineering Plates (4.4 mb)
- B. Station Location Analysis (5.3 mb)
- C. East Don River Crossing (2 mb)
- D. Richmond Hill Alignments (4.4 mb)
- E. Station Layout Concepts (6.4 mb)
- F. Preliminary Goetechnical Report (12.9 mb)
- G. Storm Water Management (238 kb)
- H. Existing Conditions Heritage (800 kb)
- I. Contamination Overview Study (10.7 mb)
- J. Natural Environment (2.8 mb)
- K. Noise Vibration Impact Study (9.1 mb)
- L. Air Quality (13.1 mb)
- M. Langstaff Longbridge Traffic Analysis (176 kb)
- N.Consultation Record - Environmental Project Report